Fujitsu ORACLE M10-1 Installation Manual page 26

Hide thumbs Also See for ORACLE M10-1:
Table of Contents

Advertisement

Table 2-3     Third-party rack checklist (continue d)
Description
Front panel mounting space of
chassis
Distance between left and right
chassis attachment holes
(common to front and rear
columns)
Distance between left and right
columns (common to front and
rear columns)
Column thickness
Structures other than columns
Cable hatch
Area of door vent openings
Size of chassis attachment
holes (common to front and
rear columns)
Vertical pitch of chassis
attachment holes
(common to front and rear
columns)
Door opening angle
Strength
Grounding
Toppling prevention measures
Earthquake resistance measures
*1 If the PCI expansion unit has square holes with sides 9.0 mm (0.35 in.) to 9.2 mm (0.36 in.) wide, a rack mount
kit needs to be prepared.
Fujitsu M10-1/SPARC M10-1 Installation Guide ・ March 2019
16
Condition
At least 483 mm (19.0 in.)
465 mm (18.3 in.)
At least 450 mm (17.7 in.)
2 mm (0.08 in.) to 2.5 mm (0.1 in.)
Rack has no structures between front and rear
columns
Rack has hatch on bottom surface, rear door, or
elsewhere
Front door: At least 73 % of door area
Rear door: At least 73 % of door area
SPARC M10-1: Square hole with sides longer than
9 mm (0.35 in.) to 9.8 mm (0.38 in.)
wide, or M6 screw hole
PCI-BOX: Square hole with sides longer than 9.2
mm (0.36 in.) and not longer than 9.8
mm (0.38 in.) (*1), or M6 screw hole
EIA standards, universal pitch
Door opens to 130°
Rack has necessary strength/load capacity for
mounting chassis
Rack and units can be grounded
Rack can be prevented from toppling over
Earthquake resistance measures can be
implemented for rack
Letter in
figure
E
F
G
H
I
J
K
L
M
--
--
--
--
--

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ORACLE M10-1 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Oracle sparc m10-1

Table of Contents