XB Reset 3
CPU Reset 1
CPU Reset 2
Reset released
CPU Start
The sequence of power control is completed.
XSCF>
4.
Execute the showdomainstatus command, and confirm that status is
"OpenBoot Running".
XSCF# showdomainstatus -p 0
Logical Domain Name
primary
XSCF#
5.
Execute the console command to connect to the console of the specified
physical partition.
The auto-boot? setting is false, so you can confirm the start up to the ok prompt.
XSCF> console -p 0
Console contents may be logged.
Connect to PPAR-ID 0?[y|n] : y
{0} ok
6.
Press the [Enter] key. Then, press the [#] (default value for the escape
symbol) and [.] (period) keys to move from the console to the XSCF shell.
{0} ok #.
exit from console.
XSCF>
7.
Execute the poweroff command to stop the physical partition.
XSCF> poweroff -a
PPAR-IDs to power off :00,01
Continue? [y|n] : y
00 : Powering off
01 : Powering off
*Note*
This command only issues the instruction to power-off.
The result of the instruction can be checked by the
"showpparprogress".
8.
Execute the showpparprogress command, and confirm that the command
displays "The sequence of power control is completed." and ends.
Fujitsu M10-1/SPARC M10-1 Installation Guide ・ March 2019
112
PPAR#0 [ 8/12]
PPAR#0 [ 9/12]
PPAR#0 [10/12]
PPAR#0 [11/12]
PPAR#0 [12/12]
Status
OpenBoot Running
[Enter]key
Need help?
Do you have a question about the ORACLE M10-1 and is the answer not in the manual?