Before Starting
There are four things you should do before starting any of the procedures listed or
described in this chapter:
o Familiarize yourself with the safety symbols marked on the device under test
(DUT), and read the general safety considerations and the safety note
definitions in the front of this guide, before you begin the procedures in this
chapter.
o Check that the DUT has been turned on and allowed to warm up.
o Ensure that the DUT is operating within a temperature range of 20 °C to 30 °C.
o Read the rest of this section.
Required Test Equipment
Refer to the required equipment table on
recommended equipment and critical test equipment specifications for the
adjustments and performance verification tests.
Chapter 8
Post-Repair Procedures
What You Will Find in This Chapter
page 244
of
Chapter 10
, for a list of
215