Waybox With Load Optimization Pro (With Photovoltaics); Customer's Vehicle Not Available During Installation - Enel X Waybox Pro Installer Manual

Hide thumbs Also See for Waybox Pro:
Table of Contents

Advertisement

REV.2 - 03/2023
2.11 Waybox with Load Optimization Pro (with
photovoltaics)
If
You want to take advantage of the Load Optimization Pro feature and you
have a photovoltaic system installed
Is it possible to leave the photovoltaic system upstream of the main switch
and Waymeter?
See
special case No.9
Don't forget:
1. Waymeter

2.12 Customer's vehicle not available during installation

If
It is not possible to perform operational tests after installation with
customer's vehicle
Do you have Test Box (vehicle simulator) available?
Perform operational test with
Test Box
See the
Charging Test
116
YES
YES
section of the installation manual
Load Optimization Pro feature not
implementable
The charging test is not conducted
NO
NO

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Waybox Pro and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Waybox plusWaybox pro midWaybox plus mid

Table of Contents