List Of Special Installation Cases - Enel X Waybox Pro Installer Manual

Hide thumbs Also See for Waybox Pro:
Table of Contents

Advertisement

REV.2 - 03/2023

2 List of Special Installation Cases

The following are the contextual conditions that determine a special installation case.
1. Data network with SIM is insufficient (valid for Waybox Plus Cellular and Waybox Pro
Cellular).
2. Single-phase IT power grid.
3. Customer smartphone connectivity not adequate.
4. Lockable garage with shutter (or other type) that weakens signal.
5. Single-phase TT/TN power grid.
6. Three-phase TT/TN power grid.
7. Single-phase TT electrical network without neutral.
8. Waybox with control board in Italy and in Holland.
9. EV Ready installation.
10. Waybox with Load Optimization Pro (without photovoltaics).
11. Waybox with Load Optimization Pro (with photovoltaics).
12. Customer's vehicle not available during installation.
13. Renault Zoe, Smart 22 kW, Twingo Electric.
14. Load Optimization Pro with transformer.
The relevant procedure to be followed for each of the special cases of installation is
described in the following paragraphs.
107

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Waybox Pro and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Waybox plusWaybox pro midWaybox plus mid

Table of Contents