Enel X Way JuiceBox OpenPay User Manual

Enel X Way JuiceBox OpenPay User Manual

Advertisement

JuiceBox OpenPay
User Manual
ENGLISH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Way JuiceBox OpenPay and is the answer not in the manual?

Questions and answers

Summary of Contents for Enel X Way JuiceBox OpenPay

  • Page 1 JuiceBox OpenPay User Manual ENGLISH...
  • Page 2 Table of contents Welcome to JuiceBox OpenPay Installation Area Installation Enterprise Setup...
  • Page 3 Welcome to JuiceBox OpenPay Installation Area The JuiceBox OpenPay requires 2 sets of THHN wires (per National Electrical Code (NEC) and/or local Authority Having Jurisdiction (AHJ) requirements and each set must have a dedicated ground conductor). Each set connects to a separate 50A breaker. All wires must protrude at least 14 in (36 cm) from the base of the installation area so that the connections can be housed inside the junction box.
  • Page 4 Installation 1. Turn off the mains power to the hardwire connections. 2. Use a multimeter to ensure that there is no power at the hardwire connections. WARNING: Do not continue with the installation until the multimeter shows that there is no power at the hardwire connections to mains. 3.
  • Page 5 Positive Negative Ground 7. Reinstall the junction box cover. 8. Reconnect power to the hardwire connections. The JuiceBox OpenPay turns on automatically. Follow the onscreen instructions. The JuiceBox OpenPay can not charge a vehicle until Enterprise Setup is complete. Continue Enterprise Setup to fully activate the JuiceBox OpenPay.

Table of Contents