Contents Of The Shipping Container; Tools And Equipment Needed; Stabilize The Rack For Installation - Oracle X9-2 Owner's Manual

Database appliance
Hide thumbs Also See for X9-2:
Table of Contents

Advertisement

Tools and Equipment Needed

A listing of the tools you will need to install Oracle Database Appliance X9-2S/X9-2L.

Stabilize the Rack for Installation

Use this procedure to stabilize the rack before installing Oracle Database Appliance
X9-2S/X9-2L.
Installing the Server Into a Rack
Tasks to complete to install Oracle Database Appliance into a rack.

Contents of the Shipping Container

A listing of the ship container contents of Oracle Database Appliance X9-2S/X9-2L.
Inspect the shipping cartons of your Oracle Database Appliance system for evidence of
physical damage. If a shipping carton appears damaged, request that the carrier's agent be
present when the carton is opened. Keep all contents and packing material for the agent's
inspection.
The ship kit for the server includes the following items:
Power cords, packaged separately with country kit
Rail kit containing rack rails, hardware, template and installation instructions
Miscellaneous hardware, cables, and connectors
Setup booklet
Legal and safety documents
Tools and Equipment Needed
A listing of the tools you will need to install Oracle Database Appliance X9-2S/X9-2L.
Obtain the following tools and equipment before beginning the installation of Oracle Database
Appliance.
Phillips head No. 2 screwdriver that is a minimum of 4 inches long
T20 Torx driver if using a threaded rack
A mechanical lift is highly recommended
Stabilize the Rack for Installation
Use this procedure to stabilize the rack before installing Oracle Database Appliance X9-2S/
X9-2L.
Caution:
Personal injury or equipment damage. To reduce the risk of personal injury,
stabilize the rack cabinet, and extend all anti-tilt devices before installing the server.
Refer to your rack cabinet documentation for more detailed instructions.
When unpacking at the installation site, verify that the rack cabinet leveling feet are up
1.
before moving the rack cabinet.
Chapter 4
Installing the System Into a Rack
4-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

X9-2sX9-2lX9-2-ha

Table of Contents