Stabilize The Rack For Installation - Oracle X6-2 Installation Manual

Exadata storage server extreme flash
Hide thumbs Also See for X6-2:
Table of Contents

Advertisement

1042" on page 33

Stabilize the Rack for Installation

To reduce the risk of personal injury, stabilize the rack cabinet, and extend all anti-tilt
Caution -
devices before installing the storage server.
Refer to your rack documentation for detailed instructions for the following steps.
1.
Open and remove the front and rear doors from the rack cabinet.
The front and rear doors need to be removed only if they impinge on the mounting bay.
Note -
2.
To prevent the rack cabinet from tipping during the installation, fully extend the
rack cabinet's anti-tilt legs or anti-tilt bar, which are located at the bottom front of
the rack cabinet.
3.
If there are leveling feet beneath the rack cabinet to prevent it from rolling,
extend these leveling feet fully downward to the floor.
When moving the rack to a new location, including repacking, verify that the leveling
Caution -
feet are up before moving the rack.
After the cabinet is installed in its location, you can use the shipping brackets to
4.
secure the cabinet to the floor.
Shipping brackets are not for use for bracing or anchoring the rack during seismic
Caution -
events.

Stabilize the Rack for Installation

Installing the Storage Server Into a Rack
29

Advertisement

Table of Contents
loading