Connecting The Power Supply To The Network And Executing A Learn Run - Siemens SIDOOR ATD4 W Series System Manual

Automatic door control units
Table of Contents

Advertisement

Connecting and commissioning

10.4 Connecting the power supply to the network and executing a learn run

10.4
Connecting the power supply to the network and executing a learn
run
Connecting the power supply to the network
1. Connect the power supply to the network.
– SIDOOR NT40: When the supply is switched on, the device is ready for operation. The
Note
On-site fuse
The on-site fuse must not exceed 10 A.
Note
For all motors, the output transmission must be checked prior to each learn run with SIDOOR
ATD4xxW and adjusted if necessary.
Perform a learn run
Note
Make sure that the entire travel range of the door is free during the learn run.
1. Make sure that the door is in the CLOSED position.
2. Press and hold down the learn run button S401.
3. Connect the power supply with slot X3 on the SIDOOR ATD4xxW control unit
4. Set the default value to 176 mm/rev for the M3, M4 and M5 motors. The output transmission
[mm/rev] must be configured for the other MDG3, MDG4 and MDG5 motors (see
section Learn run (Page 46)). The learn run buttons S401 on the SIDOOR ATD4xxW must be
pressed and held again.
5. The learn run starts automatically, and the learn run button can be released. (See
table Starting a learn run when the line voltage is applied (Page 177))
298
green LED lights up.
X3
ATD4xxW for industrial applications
System Manual, 06/2022, A5E51901827B AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents