UNLOADING THE HEADER
4. Back up until the unit clears trailer, and slowly lower to
150 mm (6 in.) from the ground.
5. Take to storage or setup area.
6. Set machine down on secure, level ground.
7. Check for shipping damage and missing parts.
Figure 1.2: Moving Header with Forklift
2
214075
Revision A