MacDon R113 Unloading And Assembly Instructions page 27

Rotary disc 13-foot self-propelled windrower header
Table of Contents

Advertisement

6. Adjust position of the center-link cylinder (A) with the
REEL UP and REEL DOWN switches on the GSL until
the hook is positioned above the header
attachment pin.
IMPORTANT:
Hook release must be down to enable self-locking
mechanism. If the release is open (up), manually push it
down after hook engages header pin.
7. Lower center-link (A) onto the header with REEL
DOWN switch until it locks into position (hook
release [B] is down).
8. Check that center-link is locked onto header by
pressing the REEL UP switch on the GSL.
CAUTION
Check to be sure all bystanders have cleared the area.
9. Press the HEADER UP switch (A) to raise header to
maximum height.
NOTE:
If one end of the header does NOT fully rise, rephase
the lift cylinders as follows:
Press and hold the HEADER UP switch until both
cylinders stop moving.
Continue to hold the switch for 3–4 seconds.
Cylinders are now phased.
NOTE:
It may be necessary to repeat this procedure if there is air in
the system.
214075
ATTACHING HEADER TO WINDROWER
21
Figure 3.23: Hydraulic Center-Link
Figure 3.24: Ground Speed Lever
Revision A

Advertisement

Table of Contents
loading

Table of Contents