Maintenance; Scheduled Maintenance Overview - Teledyne VISION G2 CLASSIC 6 User Manual

Table of Contents

Advertisement

Maintenance

Maintenance

Scheduled Maintenance Overview

After Each Test
Clean up any spills or dissolution media wherever it was spilled
on the system. Wipe down the system with a clean damp cloth
when finished.
Rinse baskets, basket shafts, paddles, and/or vessels with DI
or better quality water. Avoid harsh detergents which may
damage the materials.
Weekly
Inspect bath water for algae or other contaminants. Drain and
replace if necessary.
Monthly
Replace bath water, regardless of condition, to prevent algae
growth.
Every 6 Months
Check the temperature and motor speed calibration.
Inspect the spindles for smooth rotation.
Inspect the o-rings to ensure that the spindle shafts are held
securely.
Annually
Inspect the drive belts and idler pulleys.
Every Two Years
Replace drive belts.
Vision G2 Testers User Guide—74-108-800 Rev. H—12 June 2019
120 of 158

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vision g2 elite 8

Table of Contents