Manual Simultaneous Start With Vision G2 Tester(S) - Teledyne VISION G2 CLASSIC 6 User Manual

Table of Contents

Advertisement

Vision G2 Testers User Guide—74-108-800 Rev. H—12 June 2019

Manual Simultaneous Start with Vision G2 Tester(s)

1.
Confirm the vessels, paddles, or baskets and
baskets shafts are clean and in good condition.
Install them into their designated positions
2.
Confirm the heights of apparatus from the vessel
bottom using a height gauge.
3.
On the tester, touch the temperature to bring up the
set temperature screen. Enter the desired
temperature (+ 0.10 °C of the desired vessel
temperature is recommended) and touch OK.
4.
Raise the apparatus out of the vessels by pulling up
on the spindle shafts to their highest point, or in the
case of a Vision Elite 8, raising the drive head to its
highest point.
5.
Fill the vessels with media.
6.
Prepare the apparatus:
a. Baskets
i. Cover the vessels.
ii. Allow the media to stabilize.
b. Paddles
i. Lower the paddles into the testing
ii. Cover the vessels and allow the media
c. Paddles with ADD Cover
i. Lower the paddles into the testing
ii. Close the chamber of the ADD cover
iii. Cover the vessels and allow the media
Dissolution Testing
position. If using a Vision Elite 8, lower
the drive head.
to stabilize.
position. If using a Vision Elite 8, lower
the drive head.
by pressing the hinged portion on the
bottom of the cover closed.
to stabilize.
112 of 158

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vision g2 elite 8

Table of Contents