Installing The Hard Drive Peripheral On The System Control (Sc) Peripheral Board; Powering On A Hard Drive Peripheral; Verifying A Hard Drive Peripheral - Sun Microsystems Sun Fire E25K Service Manual

Hide thumbs Also See for Sun Fire E25K:
Table of Contents

Advertisement

7.4.2
Installing the Hard Drive Peripheral on the
System Control (SC) Peripheral Board
Caution – Support the hard drive during installation to prevent damage to the SC
peripheral board and its components.
1. Holding the front end of the new hard drive(s), insert under the rear panel and
connect to the J2 (upper drive), or J3 (lower drive), connector of the SC peripheral
SCSI backplane.
2. Secure the hard drive(s) to the SC peripheral board with the four (4 per drive) 6-32
2A UNC screws.
3. Replace the SCSI access panel and secure with the four (4) M3x6 flathead screws.
4. Install the SC peripheral board.
See
Section 7.2.4, "Installing a System Control (SC) Peripheral Board" on page
5. Close the Sun Fire E25K/E20K system cabinet access doors.
7.4.3

Powering On a Hard Drive Peripheral

G
Power on the SC by using the Sun Management Center or from the main SC by
typing the following SMS command:
sc% resetsc
About to reset other SC. Are you sure you
want to continue? (yes/no)? yes
7.4.4

Verifying a Hard Drive Peripheral

G
Verify the hard drive.
See
Section 7.2.6, "Verifying a System Control (SC) Peripheral Board" on page
Chapter 7 System Control (SC) Peripheral Board
7-7.
7-8.
7-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun fire e20k

Table of Contents