Elephant Robotics myCobot Pro 600 User Manual page 70

Table of Contents

Advertisement

5.1.2.6 Setting
In the configuration center, users can configure the robot. For example,
power the robot, turn off the robot, set the load, time, network and so on.
1,Initialization
The initialization configuration page is shown in Figure 2-21.
When robot movement is required, the user needs to enter the configuration
center → initialize the robot, or shut down the robot. In the initialization page,
you can also set the load and installation, these two are important configuration
content before other operations, such as configuration errors may cause
unexpected situations.
Figure 2- 20 Security statistics
70

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the myCobot Pro 600 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents