Ports; Installation Tips; Liquid System Plumbing Connections (65X On Left) - Teledyne SyriXus 65x Installation And Operation Manual

Syringe pumps
Table of Contents

Advertisement

SyriXus Series Pumps Installation and Operation Guide
Section 2 Fluid System Connections and Accessories
Pressure
Transducer
Nut and
Collar
Tubing to Valve
Figure 2-1 Liquid system plumbing connections (65x on left)

2.2.2 Installation Tips

EAR99 Technology Subject to Restrictions Contained on the Cover Page
2-2
Pressure
Transducer
Cap
Nut
Plug
Tubing to Valve
• Be sure to keep the tubing as straight as possible at the end, as
this will make it easier to install the ferrules.
• Be sure to cut the ends of the tubing squarely.
• Do not leave burrs on the ends of the tubing.
• When installing ferrules on the tubing, ensure the tubing
extends beyond the ferrule to allow for proper crimping.
• If the connection leaks, re-tighten fittings.
• Push the tubing completely into the port before tightening the
nut.
• When connections are made to the cylinder cap, the pressure
reading may be affected. If the pressure no longer reads zero,
release all pressure inside the pump, then press
on the front panel of the controller to readjust.
The 65x uses F250C ports, not NPT ports. Do not use pipe tape on
the 65x ports.
Nut and
Ferrule
Port
NOTE
Plug
ZERO PRESSURE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Syrixus 260xSyrixus 500xSyrixus 500xvSyrixus 1000x

Table of Contents