Install a Power Supply
The release latch engages when the power supply is fully seated.
Reconnect the power cord to the power supply and verify the following:
3.
The power supply AC Present LED is lit
■
The power supply Service Required LED is off.
■
Verify that the following LEDs are off:
4.
Service Required LEDs located on the front of both server nodes
■
REAR HDD/PS/FAN LED located on the front of both server nodes
■
See
"Storage and Boot Drive Locations" on page 48
LEDs.
60
Oracle Database Appliance Service Manual • February 2016
for more information about system