Oracle Database Appliance Service Manual page 108

Table of Contents

Advertisement

Install Power Distribution Board
b.   
Reconnect the chassis interlock switch cable [2].
Align the power distribution board with the two power connectors on the
c.   
disk midplane module and slide the power distribution board forward until
the connectors seat.
To secure the power distribution board to the system, use the holes in the
d.   
system side wall to access and tighten the two Phillips screws [3].
Reconnect the power distribution board ribbon cable [4].
e.   
Return the system to operation.
2.
a.   
Install both server nodes into the system.
108
Oracle Database Appliance Service Manual • February 2016

Advertisement

Table of Contents
loading

Table of Contents