A&D BA-T Series Instruction Manual page 13

Hide thumbs Also See for BA-T Series:
Table of Contents

Advertisement

Step 9.
Using the included cable A and cable B, connect the "weighing unit" and "breeze break unit" (with
the cable A) and the "display unit" and "weighing unit" (with the cable B) respectively, paying
attention to the direction of the arrow on each cable (on the connector).
Make sure to unplug the AC adapter before connecting.
Caution:
Step 10. If the display unit is placed in front of the weighing unit, cable B can be stowed in the left or right
groove of the weighing unit. Loosen the leveling foot when stowing the cable in the groove.
Caution: When stowing the cable, do not tilt the weighing unit.
Step 11. Connect the breeze break unit and ionizer with the included cable C.
Caution: The ionizer operates when the AC adapter is connected to the balance.
Step 12. Connect the included AC adapter to the balance.
Step 9
Step 12
AC adapter
Step 11
Step
10.
Loosen the leveling foot when
stowing the cable in the groove
Leveling foot
Display unit
Cable A
Cable B
Cable C
Breeze break unit
Weighing unit
Bottom of the weighing unit
13
Grounding terminal
Serial number
Ionizer
Groove for cable
Groove for cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ba-6teBa-6dteBa-225teBa-225dteBa-125dte

Table of Contents