A&D BA-T Series Instruction Manual page 12

Hide thumbs Also See for BA-T Series:
Table of Contents

Advertisement

Step 5. Assemble the glass breeze break.
Assemble the BA-6TE / BA-6DTE
glass breeze break in the weighing
chamber.
Align the side panes with the notch
of the base stand.
Example of the small breeze break
with the right side open.
Step 6. Insert the breeze break top door
from the handle side.
Step 7. Assemble the breeze break
doors on the left and right sides.
7a Insert the breeze break doors on
the left and right sides.
7b Secure the breeze break doors
with the latches.
Step 8. Assemble the breeze break front
glass.
8a Insert the breeze break front
glass.
8b Secure the breeze break front
glass with the latches.
Top pane
Side panes (3 pieces)
Step
5.
Base stand
Side pane
Notch
Base stand
Step
6.
Step
8b.
Step
7b.
Step 8a
12
Step
7a.
Step
Step
Step
7a.
8b.
7b.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ba-6teBa-6dteBa-225teBa-225dteBa-125dte

Table of Contents