Installation Work Flowchart - FujiFilm CR-IR 357 Service Manual

Hide thumbs Also See for CR-IR 357:
Table of Contents

Advertisement

2.

Installation Work Flowchart

 Workflow for First-Time Installation
START
3. Preparation for Installation
3.2
Unloading
3.3
Transfer
3.4
Temporary Placement
3.5
Checking the Items Supplied
4. Installation Procedures
4.1
Removing the Transportation Protective Member
5. Connecting the Cables
5.1
Connecting the Power Cable and Checking Resistance Value
5.2
Connecting the Interface Cable
6. Final Placement
6.1
Securing the Machine
6.2
Securing the Cable
7. CR Console Installation Procedures
{FCR XG-1/CR CL Service Manual}
A
014-204-01E
11.10.2005 FM4750
A
8. Installing RU Software
8.1
Starting the Machine Maintenance Utility
8.2
Setting the RU IP Address
8.3
Setting the FTP Server IP Address
8.4
Checking the Connection with the CR Console
8.5
Installing the RU PC-TOOL
8.6
Installing RU Software
9. Image/Conveyance Checks
9.1
Check Before Procedures
9.2
Image/Conveyance Checks
10. Confirming the S Value
11. Powering OFF the CR Console/RU
12. Cleaning the CR Console/RU
13. Lead Precaution Label
END
CR-IR 357 Service Manual
IN-5
IN-5

Advertisement

Table of Contents
loading

Table of Contents