Completing the Appliance Setup
What to do next
To continue with the appliance setup:
1. Configure the hosts and storage arrays that you connect to the appliance. (See
2. Implement path failover, if applicable. (See
3. Complete the wiring between the appliance and the hosts and storage arrays. (See
52
"Configuring Hosts and Storage
"Connecting the Appliance to Hosts and Storage
Arrays" on page 53.)
Implementing Path Failover
Arrays" on page 81.)
Continuous Access Storage Appliance Installation and Maintenance Guide
on page 69.)