Shipment Contents - HP Open View Installation And Maintenance Manual

Continuous access storage appliance
Table of Contents

Advertisement

Unpacking the Appliance

Shipment contents

The shipment contents contain the following items (see
for detailed specifications):
Note:
installations, determine the customer's power requirements before installation to ensure you are
using the proper equipment. For more information, refer to the Continuous Access Storage Appliance
PDU Requirements document posted on Cybrary:
http://cybrary.inet.cpqcorp.net/HW/STOR/SOLUTIONS/SV3000/index.html
16
Nodes
— Two ProLiant ML370G3 servers with the following components:
— Two standard–bracket, dual–port HP/Intel Gigabit Ethernet cards
(PWLA8492MTG1P20, MM# 844154)
— Six QLogic 2344F four–port full–profile host bus adapters (HBAs)
Peer node storage
— One HP StorageWorks Virtual Array, model 7110 (VA7110)—dual–controller,
1024MB cache
— Five 36GB 15Kb drives FC HDD
— Rail kit
— NT/Rittal rail kit
Rack accessories
— One integrated keyboard and monitor (J1470A or TFT5600RKM)
— One console switch
— Two 8 foot console switch cables
— One third-party rail kit (for the TFT5600RKM keyboard/monitor only)
— Four 16A power distribution units (PDUs) (North American preinstalled version only)
— Two NEMA L6–20 connectors (North American preinstalled version only)
Other accessories
— One hp OpenView nameplate
— One plastic–backing nameplate (HP rack only)
— Four solution serial number labels
Cables
— Two 2m FC cables (LC-LC)
— One 7 foot Ethernet crossover cable (CAT5 RJ–45)
Software
— Two Windows 2000 Server access licenses
For all international installations (preinstalled and packaged) and North American packaged
Continuous Access Storage Appliance Installation and Maintenance Guide
"Appliance
Components" on page 137
.

Advertisement

Table of Contents
loading

Table of Contents