5. Reinstall the Drive Roller, see
6. Reinstall the Take-up Roller, see
7. Center and square the running belt onto the Take-up and Drive rollers, tension the
belt to specification and verify the belt tracking, see
ing Adjustment" on
8. Reinstall the hood cover, see
left/right Landing Trim covers, see
9. Connect the power cord and switch the ON/OFF circuit breaker ON.
10. Reset the maintenance Belt Rating after a new deck/belt replacement. Open the
Maintenance Belt Rating screen and select Replacement ( Access Hardware Val-
idation service menu (51765761) , select : Maintenance > Belt Rating > Replace-
ment).
11. Do the Operation Verification tests (see
return to service.
Common Frame Belt and Deck Replacement
Review entire procedure before starting.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
"Drive Roller Replacement" on
"Take-up Roller Replacement" on
page 67.
"Covers and Panels Replacement" on
"Covers and Panels Replacement" on
"Operation Verification" on
6 Replacement Procedures
Running Belt and Deck Replacement Procedure
page 168.
"Running Belt Tension and Track-
page 178.
page 86, and
page 86.
page 24) and
Page 194