Chapter 1 INSTALLATION
1.4
PREPARATION FOR INSATALLATION
1.4.1
UNPACKING
Confirm that the following things are packed.
• Main body
• Scale unit
• Grounding cable
• Tool Screw driver(+)
• User's manual
• Weight (500g)
• Cleaning pen
NOTE: Parts are fixed with adhesive tapes so as not to move when transported.
Remove these tapes when unpacking.
1.4.2
THINGS TO BE PREPARED
• Weight (6kg,15kg,30lb)
• IF-21FD
• 3.5-inch 2DD floppy disk in which the user's data is recorded
• I2NET cable (D-sub 9 pin -modular)
• Labels
1-6
IP-EMZ Service Manual
Need help?
Do you have a question about the IP-EMZ and is the answer not in the manual?