Unpack Power Cabinet; Before Unpacking - ABB HVC Installation Manual

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide
7.
For the DC power cables, make sure that a cable length of 39.37 Inch is available above
the surface for internal routing in the cabinet.
8.
For the other cables, make sure that a cable length of 118.11 Inch is available above the
surface for internal routing in the cabinet.
This extra cable length is required to connect the cables with the
connectors in the Power Cabinet without problems.

5.3. Unpack Power Cabinet

5.3.1. Before unpacking

Unloading Power Cabinet
The delivery truck only unloads the pallet carrying the Power Cabinet.
The delivery truck will not move the Power Cabinet to its final location.
The placement of the Power Cabinet to its final location is the
responsibility of the contractor. Upon request it is possible to order a truck
with a crane.
Do not pollute the environment with plastic and cardboard packing.
Depollute these things according the regional applicable regulations as
well as environment-friendly.
Preconditions:
All construction work is completed.
The product is delivered by a transport company at the confirmed date of delivery.
1.
Make sure that the Power Cabinet has not been shaken or tilted over 30⁰.
Revision: 1.2
Date released: 16-08-2018
NOTICE
NOTICE
CAUTION
COMPANY CONFIDENTIAL
Page 53 of 128