ABB HVC Installation Manual page 104

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide
4.
Mount on the predrilled holes on both sides of the vertical frame (A) one socket bolt M6x16
including with washer (B).
5.
Hang the backside below cover (A) on the two bolts (B).
Revision: 1.2
Date released: 16-08-2018
COMPANY CONFIDENTIAL
Page 104 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents