HVC 450 kW E-Bus Charger Installation Guide
2.
Move the vertical frame to the foundation.
5.13.
Install vertical frame onto the foundation
Preconditions:
Tools: spanner (size 36), torque wrench (size 36)
Make sure that the main switch of the power supply group for the product
is set to the OFF position. Do a voltage check to make sure that the
electrical power is disconnected from the system.
Installation on concrete foundation
Revision: 1.2
Date released: 16-08-2018
DANGER
COMPANY CONFIDENTIAL
Page 84 of 128