1.
Unlock the locks (B).
2.
Open the door (A).
5.16.3.

Connect the DC+ power in- and output cables

Preconditions:
Tools: wire cutter, wire stripper pliers, wire-end rings (Cembre A48-M12 cable lug,
when using 500 MCM cables) (6x), spanner (size13 and 18), torque wrench (size 13
and 18).
Ensure that the DC cables during mounting do not hit the PCBAs on the
door of the ACS Control Module. When these cables hit the PCBAs, the
PBCAs can be damaged. It is advised to protect the PCBAs during
mounting of the DC cables.
To prevent damage of the PCBAs in the ACS Control Module:
1.
Cut the DC cables at 15.75 Inch from the bottom side of the ACS Control Module.
2.
Open the door of the ACS Control Module and check the required length.
Remove the DC contactor's protection cover.
3.