ABB HVC Installation Manual page 98

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide
Slide the cable gland's nut (A) over the metal finish tulle (C) of the communication glass
3.
fiber cable.
Slide the cable gland's rubber seal (B) over the metal finish tulle (C) of the communication
4.
glass fiber cable.
To prevent damage to the glass fiber communication cable, always slide
the cable gland's rubber seal over the metal finish tulle before insert the
glass fiber communication cable into the cable gland.
Insert the communication cable into the cable gland (#11) and tighten the cable gland's
5.
nut to secure the cable.
6.
Route the communication fiber cables to module U5 (A) and U7 (B).
7.
Remove the protection covers from the optical connectors.
8.
Connect the two Ethernet fiber cables (C) onto module (A):
 Rx with Td U5;
 Tx with Rd U5.
9.
Connect the two CAN bus fiber cables (D) onto module (B):
 Rx with Td U7;
 Tx with Rd U7.
Revision: 1.2
Date released: 16-08-2018
CAUTION
COMPANY CONFIDENTIAL
Page 98 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents