HVC 450 kW E-Bus Charger Installation Guide

5. Placement and Connection

5.1. About placement and connection

When all mechanical work is finished, the HVC 450 kW E-Bus Charger can be placed and
connected.
The planning steps for the placement and connection phase are shown in the figure below.
Usually the procedure can be done within one day.
C1
Route the cables on Page 52.
C2
Unpack on Page 53.
C3
Move Power Cabinet to position on Page 54 and Install Power Cabinet onto the
foundation on Page 57.
C4
Connect the AC power cable on Page 64, Connect the DC power cables on Page 70,
Connect AC utility power, Interlock and CAN cables Power Cabinet Connect AC utility
power, Interlock and CAN cables on Page 72 and Connect the communication fiber
cables on Page 80.
C5
Unpack the Charge control set on Page 82.
C6
Move the ABB pole to position on Page 83, Install vertical frame onto the foundation
on Page 84 and Install horizontal frame onto the vertical frame on Page 86.
Revision: 1.2
Date released: 16-08-2018
COMPANY CONFIDENTIAL
Page 51 of 128