HVC 450 kW E-Bus Charger Installation Guide
Be aware that the correct height to the bottom side of the foot print of
the vertical frame relative to the ground level of the top of road (=
charging position of the bus) must be calculated by ABB. Contact ABB
Sales department (see Contact information on Page 13 for contact
details).
7.
Tighten the nuts with a tightening torque of 590.05 ft-lb when no copper fat is used, and
with a tightening torque of 390.91 ft-lb when copper fat is used.
8.
Screw the second M24 nuts on the bolts (16x)
9.
Tighten the upper nuts.
5.14.

Install horizontal frame onto the vertical frame

Preconditions:
Tools: boom lift, spanner (size 36 and 24), torque wrench (size 36 and 24)
Installation on vertical frame