ABB HVC Installation Manual page 75

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide
Interlock cable connection in slave 1 HVC 150S:
A
Terminal block
B
Interlock cable from/to slave 2 HVC 150S
C
Interlock cable from/to master HVC 150
1.
Move the cables towards the terminal block (A).
2.
Strip 0.43 Inch of the insulation from the ends of the wires.
3.
Crimp a ferrule onto the end of the wire.
4.
Loosen the connector screws.
5.
Insert the wires into the connectors, see table below:
Functional description
Interlock In (master HVC 150)
Interlock Out (master HVC 150)
Interlock GND (master HVC 150)
Interlock In (slave 2 HVC 150S)
Interlock Out (slave 2 HVC 150S)
Interlock GND (slave 2 HVC 150S)
See also Appendix H Signal connection diagram.
6.
Tighten the connector screws.
Revision: 1.2
Date released: 16-08-2018
Connector
Wire number
X286-4
2
X286-6
1
X286-9
Shield
X286-7
1
X286-8
2
X286-5
Shield
COMPANY CONFIDENTIAL
Page 75 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents