Remove Packaging; Move Power Cabinet To Position - ABB HVC Installation Manual

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide

5.3.2. Remove packaging

Preconditions
Tools: spanner (size 24).
1.
Remove the packaging material from the Power Cabinet.
2.
Remove the bag which contain the keys, cover caps and mounting material that are
attached with tape on one of the lifting eyebolt at the top of the cabinet.
3.
Keep this bag with parts in a safe place.
4.
Remove the nuts (A) at the four corners.

5.4. Move Power Cabinet to position

There are two options to move the Power Cabinet from the delivery truck to the location.
Use a hoist to lift the cabinet from the top. See Move cabinet with a hoist on Page 55.
Use a forklift truck to lift the cabinet from the bottom. See Move cabinet with a forklift
truck on Page 56.
Preconditions:
All packaging material is removed from the Power Cabinet.
The two cover plates are removed from the foundation.
The tapped holes of the foundation are free from dust. If necessary, clean the holes
with a vacuum cleaner. Use a thread tap to make sure that the bolts will go in smoothly.
Revision: 1.2
Date released: 16-08-2018
COMPANY CONFIDENTIAL
Page 54 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents