4. Tighten the cable grip ensuring proper slack inside the control box.
See Section 2.6.2.6 for optional powering with 10-15 VDC power supply.

2.6.2.8 Finalize Electrical Installation

To finalize the electrical installation:
1. Ensure all wiring is complete.
2. Ensure all wires are secure.
3. Ensure the cable grips are firmly tightened.
4. Secure the Control Box Assembly lid and ensure the Control Box Assembly is sealed up.
5. Secure the Junction Box lid and ensure the Junction Box is sealed up.
6. Plug the HHRC cable into the bulkhead connector on the Junction Box (Figure 2-23).
Secure the connector in place so that the cable is secure.
Note: When the HHRC cable is removed from the Junction Box, screw the Dust Cap
onto the bulkhead connector on the Junction Box.
Bulkhead
Connector
7. The HHRC has an Ø10 mm (Ø 0.394 inch) eyelet to allow the HHRC to be hung on a
customer-provided hook. Install the hook near the Junction Box as appropriate.
TP-5554501-B
May 2019
I
NSTRUCTIONS FOR

Figure 2-23 Bulkhead Connector

Original Instructions
N
S
L
& I
IGHT
CAN
ITE
NFLEXION
HD
2-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inflexion hd

Table of Contents