Electrical Installation Detailed Instructions; Figure 2-7 Night Scan Lite System Customer Wiring Overview (Not To Scale); Figure 2-8 Grounding Lug Location - Will Burt NIGHT SCAN LITE Instructions Manual

Mobile lighting tower
Table of Contents

Advertisement

I
N
NSTRUCTIONS FOR
IGHT

2.6.2 Electrical Installation Detailed Instructions

The following are detailed steps describing the electrical installation of the Night Scan Lite and
Inflexion HD. The exact installation procedures may vary based on the configuration of the
system being used and the installation environment. Use the best and safest method for your
circumstances.
Before electrically installing the system, review the following:
Figure 2-7 for an overview of the System Wiring
Figure 2-9 for the Power Relay Wiring Diagram
Figure 2-10 for the Main Control Board Wiring Diagram
Figure 2-11 for the Remote Junction Box Wiring Diagram

Figure 2-7 Night Scan Lite System Customer Wiring Overview (Not to Scale)

For payload applications utilizing AC powered equipment, a grounding lug is provided. The
installer shall ensure the proper grounding connections are made for the application (Figure
2-8).
2-14
S
L
& I
CAN
ITE
NFLEXION

Figure 2-8 Grounding Lug Location

Original Instructions
HD
Grounding Lug
TP-5554501-B
May
2019

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inflexion hd

Table of Contents