Turning The Notification Pager Power On; Connecting To Robot Operations Center - SoftBank Whiz Operational Manual

Commercial robot vacuum
Hide thumbs Also See for Whiz:
Table of Contents

Advertisement

Whiz Operational Manual

6-2-8 Turning the Notification Pager Power On

Before turning the power On, check that the notification pager is fully charged. If the notification pager
battery is low, charge the battery fully before using the pager. (see "P103 11-4 Recharging the
Notification Pager").
1
Turn the notification pager On (see "P99 11-2 Turning the Notification Pager On/Off).
■ After turning notification pager On, pair the pager. (see "P101 11-3 Pairing the Notification Pager")

6-2-9 Connecting to Robot Operations Center

Turn off the power switch in advance with the machine connected to the network (LTE)(Fig. 6-31) When
the main power switch is turned on again, the machine is automatically connected to the network and the
Robot Operations Center (ROC).
1
Press the main power switch (I/O) to turn it on (I) (Fig. 6-32).
A screen indicating the machine is loading appears on the touch display.
Fig. 6-31
Fig. 6-32
39 / 145

Advertisement

Table of Contents
loading

Table of Contents