Machine Setup And Parts Installation; Removing The Machine From Its Packaging - SoftBank Whiz Operational Manual

Commercial robot vacuum
Hide thumbs Also See for Whiz:
Table of Contents

Advertisement

Whiz Operational Manual

6 Machine Setup and Parts Installation

6-1 Removing the Machine from Its Packaging

Unpack the machine. As a safety precaution, be sure to unpack with at least two people.
NOTE
1
Pinch the lock on the locking tab that is attached to the outer box (Fig. 6-1).
2
Lift the lock (Fig. 6-2) and remove the locking tab (Fig. 6-3).
■ Repeat this procedure for the 3 remaining locking tabs on the outer box.
■ Check that the packaging is not damaged; if damaged, immediately contact
customer support (cc@icerobo.com).
■ Do not discard the packaging box or packing material, and store it safely. It will be
required when storing the machine out of use for a long period (see "P126 13-3
Storing the Machine").
Fig. 6-1
Fig. 6-2
27 / 145
Fig. 6-3

Advertisement

Table of Contents
loading

Table of Contents