Maintenance And Inspection - Eaton Rapid Link 5 Manual

Table of Contents

Advertisement

1 Rapid Link 5 system

1.8 Maintenance and inspection

1.8 Maintenance and inspection
32
If the general rated operational data (→ Table 2, page 19) is observed and
the special technical data is taken into account
(→ Section 5.4, Specific technical data, page 124 andPage 138) for the res-
pective power classes and versions, RAMO5 and RASP5 are maintenance-
free. External factors can, however, influence the components's lifespan and
function. We therefore recommend that regular checks and the following
general maintenance measures be performed at the specified intervals.
Table 7:
Maintenance measures and maintenance intervals
Maintenance measures
Clean cooling vents (cooling slits) - RASP5 only
Check the fan function - RASP5 only
Check plug-in connectors (AS-Interface, sensors, mains,
motor, etc.) and all metallic surfaces for corrosion
STO function (RASP5 with STO input only)
RAMO5 or RASP5 units have not been designed to allow individual assem-
blies of a device to be replaced or repaired.
Rapid Link 5 · RAMO5 · RASP5 05/20 MN034004EN www.eaton.com
Maintenance interval
please enquire
6 - 24 months (depending on the environment)
6 - 24 months (depending on the environment)
Activate and deactivate STO at least once every three
months.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rapid link ramo5Rapid link rasp5

Table of Contents