Turning On The Dionex Easion Power; Connecting To Chromeleon; Preparing The Eluent - Thermo Scientific Dionex Easion Operator's Manual

Ion chromatography system
Hide thumbs Also See for Dionex Easion:
Table of Contents

Advertisement

Dionex Easion Operator's Manual
3.2

Turning On the Dionex Easion Power

Press the power switch on the Dionex Easion rear panel (see
the system power. These are the conditions at power-up:
The pump is off.
The injection valve is in the Load position.
The conductivity detector begins reading the current conductivity.
3.3

Connecting to Chromeleon

If you are beginning operation of a Dionex Easion that has not been configured in
a Chromeleon instrument, refer to the Chromeleon Help for setup instructions
before proceeding.
To start the Chromeleon client:
1. Click Start > All Programs > Thermo Chromeleon 7 > Chromeleon 7.
2. In the Console, click the Instruments Category Bar.
3. Select the name of the instrument in which the Dionex Easion is configured.
Chromeleon will connect to the instrument and display the ePanel Set (see
Figure
2-10).
3.4

Preparing the Eluent

1. Prepare the eluent. For instructions, refer to the column manual.
2. Fill the eluent bottle with the prepared eluent.
3. Insert the stopper assembly tubing into the bottle and hand-tighten the cap.
4. Use the Eluent Fill Volume slider on the Chromeleon ePanel to reset the
volume of liquid in the eluent bottle.
Chromeleon determines eluent usage by monitoring the flow rate and the
length of time the pump is on. As the eluent is depleted, Chromeleon updates
the Eluent Fill Volume display.
To ensure the accuracy of the Eluent Fill Volume display, reset the
volume each time the eluent bottle is filled.
28
Figure
2-3) to turn on
Doc. 155028-01 08/20

Advertisement

Table of Contents
loading

Table of Contents