Thermo Scientific Dionex Easion Operator's Manual page 40

Ion chromatography system
Hide thumbs Also See for Dionex Easion:
Table of Contents

Advertisement

Dionex Easion Operator's Manual
4. Click Prime on the Chromeleon ePanel (see
–or–
Open the Command window (by pressing the F8 key), select the Pump
command, and select the Prime option.
5. The pump will begin pumping at about 3 mL/min. Continue priming the
Dionex Easion until no air bubbles are exiting the pump waste line.
6. Click the pump Off button on the Chromeleon ePanel.
7. Close the waste valve. Do not overtighten. The pump is now ready for
operation.
NOTE A convenient way to verify that the waste valve is closed
32
Secondary
Pump Head
Waste Valve
(Open)
Figure 3-3. Priming the Pump
is to select the pump flow rate required for your
application, turn on the pump, and then close the valve.
The pressure should rise to the value expected for the
application and quickly stabilize.
Figure
2-10).
Doc. 155028-01 08/20

Advertisement

Table of Contents
loading

Table of Contents