Dionex Easion Operator's Manual
Waste Valve
6. Close the waste valve.
7. Under Pressure Transducer, click Calibrate Slope. A panel with
8. Follow the instructions on the panel to complete the transducer slope
9. Turn off the pump.
10. Disconnect the pressure gauge and backpressure tubing.
11. Reconnect the pressure transducer to the pump.
64
NOTE To open the waste valve on the front of the
secondary pump head (see
knob one-half turn counterclockwise.
Figure 5-1. Dionex Easion Interior Components
instructions and command buttons appears.
calibration procedure. The new slope will be determined and then
stored as the current value.
Figure
5-1), turn the
Pressure
Transducer
Doc. 155028-01 08/20