Rear Of Expansion Canisters That Shows The - IBM Storwize V7000 Unified Problem Determination Manual

Table of Contents

Advertisement

Be aware of the following canister LED states:
v If the power LED is on, do not remove an expansion canister unless directed to
do so by a service procedure.
v If the power LED is flashing or off, it is safe to remove an expansion canister.
However, do not remove an expansion canister unless directed to do so by a
service procedure.
Attention: Even if an expansion canister is powered off, it is still possible to lose
data. Do not remove an expansion canister unless directed to do so by a service
procedure.
To replace an expansion canister, perform the following steps:
Procedure
1. Read the safety information to which "Preparing to remove and replace parts"
on page 224 refers.
2. Record which SAS cables are plugged into the specific ports of the expansion
canister. The cables must be inserted back into the same ports after the
replacement is complete; otherwise, the system cannot function properly.
3. Disconnect the SAS cables for each canister.
4. Grasp the handle between the thumb and forefinger.
Note: Ensure that you are opening the correct handle. The handle locations
for the node canisters and expansion canisters are slightly different.
Handles for the upper and lower expansion canisters overlap each other. The
handle with the finger grip on the left removes the upper canister ( 1 ). The
handle with the finger grip on the right removes the lower canister ( 2 ).
Figure 51. Rear of expansion canisters that shows the handles.
5. Squeeze them together to release the handle.
1
2
Chapter 5. Control enclosure
227

Advertisement

Table of Contents
loading

Table of Contents