Removing The Battery From The Battery Carrier - IBM Storwize V7000 Unified Problem Determination Manual

Table of Contents

Advertisement

Battery
cable
Battery
connector
Figure 34. Removing the battery from the battery carrier
Installing the serveRAID SAS controller battery on the remote
battery tray
The following procedure is for a Tier 1 customer replaceable unit (CRU).
Replacement of Tier 1 CRUs is your responsibility. If IBM installs a Tier 1 CRU at
your request, you will be charged for the installation. Service agreements can be
purchased so that you can ask IBM to replace these units.
About this task
Note: Before running a procedure, refer to "Removing a file module to perform a
maintenance action" on page 55.
To install the serveRAID SAS controller battery on the remote battery tray,
complete the following procedure.
Procedure
1. Place the replacement battery on the battery carrier from which the former
2. Connect the remote battery cable to the interposer card.
134
Storwize V7000 Unified: Problem Determination Guide Version
Note: If your battery and battery carrier are attached with screws instead of
a locking-clip mechanism, remove the three screws to remove the battery
from the battery carrier. See Figure 34.
Remote battery
cable connector
Battery
Battery
carrier
e. If you are instructed to return the ServeRAID SAS controller battery, follow
all packaging instructions, and use any packaging materials for shipping
that are supplied to you.
battery had been removed, and connect the battery carrier cable to the
replacement battery.
Attention: To avoid damage to the hardware, make sure that you align the
black dot on the cable connector with the black dot on the connector on the
interposer card. Do not force the remote battery cable into the connector. See
Figure 35 on page 135

Advertisement

Table of Contents
loading

Table of Contents