Komatsu Galeo PC800-8 Shop Manual page 1101

Hydraulic excavator
Table of Contents

Advertisement

50 Disassembly and assembly
12. Remove mounting bolt (24) and connector
(25).
13. Disconnect heater hoses (22) and (23) and air
conditioner hose (26).
a Put tags to the disconnected hoses and
tubes to prevent a mistake in re-connect-
ing them.
14. Remove the 7 mounting bolts and air condi-
tioner unit assembly (27).
a (18): Removed controller.
PC800, 850-8
Installation
[*1]
Carry out installation in the reverse order to
q
removal.
[*1]
[*1]
a When installing the air conditioner circuit
hoses, take care that dirt, water, etc. will
not enter them.
a When connecting each air conditioner
hose, check that the O-ring is fitted to the
joint.
a Check that each O-ring is free from flaw
and deterioration.
a Coat the O-ring with compressor oil for
R134a (DENSO: ND-OIL 8, ZEXEL: ZXL
100 PG (PAG 46 or equivalent)) and
tighten the nuts with 2 spanners.
3
Hose clamp (M6 bolt):
3
Hose screw of M16 x 1.5:
3
Hose screw of M22 x 1.5:
3
Hose screw of M24 x 1.5:
Filling air conditioner circuit with refriger-
q
ant (R134a)
Fill the air conditioner circuit with refrigerant
(R134a).
a Quantity of refrigerant: 1,330 ± 50 g
Refilling with coolant
q
Add coolant through the coolant filler to the
specified level. Run the engine to circulate the
coolant through the system. Then, check the
coolant level again.
5
Coolant: 100 l
SEN01060-01
7.84 – 11.8 Nm {0.8 – 1.2 kgm}
11.8 – 14.7 Nm {1.2 – 1.5 kgm}
19.6 – 24.5 Nm {2.0 – 2.5 kgm}
29.3 – 34.3 Nm {3.0 – 3.5 kgm}
3

Advertisement

Table of Contents
loading

Table of Contents