Komatsu Galeo PC800-8 Shop Manual page 1075

Hydraulic excavator
Table of Contents

Advertisement

50 Disassembly and assembly
9.
Start the engine, back the machine slowly and
lower the boom foot section to touch the
ground using a crane.
k
When backing the machine, confirm
that the boom foot section is com-
pletely separated from the machine
body side before starting backing of
the machine.
4
Work equipment assembly:
15,570 kg (PC800, PC800LC)
17,450 kg (PC850)
16,535 kg (PC800SE)
16,970 kg (PC850SE)
PC800, 850-8
Installation
Installation shall be made in the reversed
q
procedure of the removal procedure.
[*1]
2
To the inner surface of the bushing when
assembling the pin:
Anti-friction material (LM-P)
2
Greasing after assembling the pin:
k
When matching the position of the pin hole,
never insert finger into the pin hole.
a Make adjustment so that clearance (a) between
the end face of the foot of boom (3) and bracket
(4) may become 1 mm or less, using shim (5).
Shim thickness: 1.0 and 1.5 mm
q
Air Bleeding
q
a Carry out air bleeding referring to the sec-
tion "Bleeding air from each part" in the
"Testing and adjusting".
Filling the oil (Hydraulic oil tank)
q
a Fill the oil to the stipulated level from the
oil filler port, start the engine to circulate
the oil inside the piping and, after that, re-
check the oil level.
SEN01058-00
Grease (LM-G)
25

Advertisement

Table of Contents
loading

Table of Contents