Installing The Device In An Equipment Rack With The Rack Mount Kit Brackets; Required Items For The Rack Mount Kit Brackets; Device Orientations In The Equipment Rack; Figure 19: Bracket Holes - Allied Telesis x320 Series Installation Manual

Gigabit layer 3+ ethernet switches with external power supply unit
Table of Contents

Advertisement

Chapter 4: Installing the Device in an Equipment Rack
Installing the Device in an Equipment Rack with the Rack Mount Kit
Brackets
Required Items
for the Rack
Mount Kit
Brackets
Device
Orientations in
the Equipment
Rack
57
This section contains the procedure for installing the device in a standard
19-inch equipment rack, with the Rack Mount Kit brackets that are
included with the device.
The following items are required to install the device in an equipment rack.
One 19" rack mount kit (3 brackets, 10 screws)
(included with the device) (see Figure 10 on page 45)
Four standard equipment rack screws (not provided)
Cross-head screwdriver (not provided)
The switches have two sets of four screw holes on the front left and right
sides, for attaching the Rack Mount Kit brackets. The PWR300 power
supply has four sets of four screw holes on the left and right sides, for
attaching the Rack Mount Kit brackets. Refer to Figure 19 on page 57.
x320-10GH
PWR300
Figure 19. Bracket Holes
Bracket Holes
Bracket Holes

Advertisement

Table of Contents
loading

This manual is also suitable for:

X320-10ghPwr300

Table of Contents