Figure 46: Marking The Locations Of The Bracket Holes On A Concrete Wall - Allied Telesis x320 Series Installation Manual

Gigabit layer 3+ ethernet switches with external power supply unit
Table of Contents

Advertisement

Chapter 6: Installing the Device on a Wall
85
Figure 46. Marking the Locations of the Bracket Holes on a Concrete Wall
4. Use a drill and a 1/4-inch carbide drill bit to pre-drill the holes you
marked in step 3. Please review the following guidelines:
Prior to drilling, set the drill to hammer and rotation mode. The
modes break up the concrete and clean out the hole.
Clean out the holes with a brush or compressed air.
5. Insert the anchors into the holes.
6. Have another person hold the device at the selected wall location
while you secure it to the wall with the M4x32mm screws provided.
Refer to Figure 47 on page 86.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X320-10ghPwr300

Table of Contents