Installing The Device On A Plywood Base - Allied Telesis x320 Series Installation Manual

Gigabit layer 3+ ethernet switches with external power supply unit
Table of Contents

Advertisement

Chapter 6: Installing the Device on a Wall

Installing the Device on a Plywood Base

81
This procedure assumes that the plywood base for the device is already
installed on the wall. Please review "Reviewing Safety Precautions" on
page 35 and "Choosing a Site for the Device" on page 40 before
performing this procedure. Allied Telesis recommends a minimum of two
people for this procedure.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall. 
E105
Follow these guidelines as you position the device on the wall:
Position the device so that the front panel is facing left. right, or down.
Refer to Figure 45 on page 83. Do not install it with the front panel up
down.
Leave sufficient space from other devices or walls so that you can
access the front panel, and for adequate air ventilation. Refer to
"Planning the Installation" on page 51.
To install the device on the plywood base, perform the following
procedure:
1. Place the device on a table.
2. For the x320-10GH switch, install two BRKT-J24 wall brackets, one on
each side of the front panel of the unit, with the eight M4x6mm screws
included with the device. Refer to Figure 43 on page 82. For the
PWR300 power supply, install four BRKT-J24 wall brackets, two on
each side of the of the unit, with the 16 M4x6mm screws included with
the device. Refer to Figure 44 on page 82.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X320-10ghPwr300

Table of Contents