Rockwell Automation Allen-Bradley DriveLogix 5730 User Manual page 115

Or powerflex 700s drives with phase ii control
Table of Contents

Advertisement

Producing a tag
Produced data must be of DINT or REAL data type or a structure. You can
use a user-defined structure to group BOOL, SINT, and INT data to be
produced. To create a produced tag:
1. You must be programming offline.
2. In the controller organizer, double-click the Controller Tags folder and
then click the Edit Tags tab.
3. Select the tag that you want to produce, or enter a new tag, and display
the Tag Properties dialog box.
4. Make sure the tag is controller scope.
5. Select the "Produce this tag" check box. Specify how many controllers
can consume the tag.
You can produce a base, alias, or consumed tag.
The consumed tag in a receiving controller must have the same data type as
the produced tag in the originating controller. The controller performs type
checking to ensure proper data is being received.
Produced tags require connections. The number of connections depends on
how many controllers are consuming the tags. The controller requires one
connection for the produced tag and the first consumer. Then, the controller
requires an additional connection for each subsequent consumer.
Communicating with Devices on an EtherNet/IP Link
6-17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Allen-Bradley DriveLogix 5730 and is the answer not in the manual?

This manual is also suitable for:

Drivelogix 5730

Table of Contents